I have a lot of space there, but little wall space, unfortunately. Wide open spaces, surrounded by cement walls, save for a 10-foot wall segment.
So originally, I was going to stick all my DC signals together, and then worry about the rest. Because of the 3M Ped, I had a hard time wrapping my head around a Durasig and 3M on the same wall togehter. (Nothing against the Durasig! I man that the look just wouldn't jive.)
So I decided to stick all the visibility-limited signals together. So far, I have the 'frankenstein'(*) 3M signal, and the DC Ped signal hung. I have the McCain to get hung still. The 3M will be the thru, ped is, well, the ped, and the McCain will be the left. So far, here's the two 3Ms hung up -




(*) I call it the 'frankensignal', because it was reassembled from a handful of other 3Ms.
The 3M and McCain will be LEDs, but I'll keep the ped bulbs. I'm also torn on whether to limit the light (to better show off the limiting) or leave them wide open..